Thursday, 22 May 2025

Harden leads survey on longhouse roads

Facebook
X
WhatsApp
Telegram
Email
Harden (right) surveying the conditions at Jambatan Kaong Ulu Paku and the construction of the cemented road heading to Kampung Samak.

LET’S READ SUARA SARAWAK/ NEW SARAWAK TRIBUNE E-PAPER FOR FREE AS ​​EARLY AS 2 AM EVERY DAY. CLICK LINK

SIMANGGANG: Assistant Minister of Community Wellbeing and Simanggang assemblyman Datuk Francis Harden Hollis together with Public Works Department (JKR) Sri Aman Division new engineer Christhoper George on Saturday (June 27) surveyed the access road to longhouses and the bridge conditions in the interior of Ulu Paku.

This survey was to allow the JKR engineer to see for himself the condition of the road and formulate plans which need to be implemented to suit the current situation and the needs of the locals, said a press statement on Saturday (June 27).

All longhouses in the Ulu Paku, Undop area have been connected with a road network, but the current efforts now are to upgrade the roads for the convenience of users.

Also present at the visit were JKR Sri Aman Division assistant engineer Shahabuddin Abu Bakar, assistant engineer Nor Aini Ahmad and planner Helga Edward, the statement concluded.

Related News

Most Viewed Last 2 Days

KCH-Semeba clean-2105-fk=300(1)
Community clean-up to protect Sarawak’s oldest geological heritage site
KCH-aidel sof-2105-aj 2
Sarawak reviews engineering consultant fee policy
BTU-frozen-2105-aj 1
Cops uncover RM6.2 mil worth of illegal frozen meat
SRN-wanted-2105-aj
Cops seek key witness in drug trafficking case
DUN-ncr debate-1211-np-1
Baru Bian urges gun licence reform, action on school delay