
Solution found to driftwood debris, says Lee
MIRI: Several modifications will be made to the Kampung Batu Satu Kuala Baram Erosion Control Project to overcome the stranding of driftwood debris on the beach. “A team of experts and engineers have studied and suggested that the groynes (low wall or barrier) and existing concrete ramps need to be








