KUCHING: After a decade representing Batu Kawah, Deputy Premier Datuk Amar Dr Sim Kui Hian is preparing to defend the constituency for a third consecutive term, with the prospect of a straight fight against Democratic Action Party (DAP) challenger, Sim Kiat Leng, in the 13th Sarawak general election (SGE13).
Dr Sim, who is also Sarawak United Peoples’ Party (SUPP) president, will once again carry the Gabungan Parti Sarawak (GPS) banner in the N.14 constituency.
A medical specialist who currently serves as a Visiting Senior Consultant Cardiologist at the Sarawak Heart Centre in Kota Samarahan, Dr Sim first ventured into electoral politics in the 2011 state election.
He contested the Pending seat against incumbent DAP assemblywoman, Violet Yong, but was unsuccessful.
He returned to the electoral contest in 2016, this time in Batu Kawah, where he defeated incumbent Christina Chiew with a majority of 2,085 votes under the Barisan Nasional (BN) ticket.
Five years later, he defended the seat under GPS, securing 7,827 votes and increasing his majority to 5,393 in a four-cornered contest against DAP’s Dr Kelvin Yii, Parti Bumi Kenyalang’s Chai Kueh Khun, and Sarawak People’s Aspiration Party’s Fong Pau Teck.
Over the past 10 years, development has been a major part of Dr Sim’s work in Batu Kawah, particularly in improving road connectivity, addressing flooding, and providing better facilities for local communities.
According to figures disclosed by Dr Sim in previous media report, approximately RM936 million was channelled into the constituency between 2022 and 2026, compared with RM300 million during his first term from 2016 to 2021.
This brings the total development funding over his decade-long tenure to approximately RM1.236 billion.
Among the major projects is the RM160-million Batu Kawa Second Bridge, intended to improve connectivity and ease traffic congestion in an area that has seen considerable residential and commercial growth.
Another major undertaking is the RM207.88-million Batu Kawa–Jalan Stephen Yong road project, launched on November 11.
The 5.664km dual-carriageway project includes two bridges crossing Sungai Moyan and Sungai Sarawak.
Flooding, meanwhile, remains an important issue for many residents. More than RM200 million has been allocated for flood mitigation works in the constituency, including drainage improvements and retention ponds.
These include the RM36.6-million second-phase flood mitigation project at Taman Desa Wira, as well as additional retention ponds and drainage improvements near Batu Kawa New Township and Pine Square.
Beyond roads and drainage, efforts have also been made to improve recreational and community spaces, including Batu Kawa Riverbank Park and the transformation of the former Ang Cheng Ho Quarry into a recreational area.
Dr Sim has also outlined further development plans, including additional bridges, improved road connections and potential Autonomous Rapid Transit (ART) connectivity to support the area’s future growth.
This time, however, he will have to face a new challenge from DAP’s Sim Kiat Leng, as the opposition party seeks to contest the seat against the incumbent.
Whether the contest will remain a straight fight or turn into a three-cornered battle will only be known on nomination day tomorrow (Nov. 28) , when independent candidates and other parties have the opportunity to enter the race.
The SGE13 will be held on December 12, with campaigning running from November 28 to December 11.




