KUCHING: Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg is set to defend Gedong for a second term, with attention turning to whether he will face a challenger or be returned unopposed in the 13th Sarawak general election (SGE13).
Abang Johari, who is also Gabungan Parti Sarawak (GPS) chairman and Parti Pesaka Bumiputera Bersatu (PBB) president, was among the 82 candidates announced by the coalition on November 25.
His return to Gedong marks his second consecutive contest in the constituency after moving from Satok, which he represented for nine consecutive terms, in the 2021 state election.
He made a strong entry into Gedong during the 12th Sarawak general election, winning with a majority of 3,607 votes in a four-cornered contest.
Abang Johari polled 4,310 votes against Parti Sarawak Bersatu (PSB) candidate Mohamad Sofian Fariz Sharbini, who secured 703 votes, while Parti Bumi Kenyalang (PBK) candidate Tomson Ango received 157 votes and Parti Amanah Negara (Amanah) candidate Kamal Bujang garnered 94 votes.
The victory marked a significant political transition for Abang Johari, who had represented Satok since 1981 before moving to Gedong, taking over the candidacy from then-incumbent Datuk Seri Mohd Naroden Majais.
Since becoming the Gedong assemblyman, Abang Johari has outlined an ambitious development agenda for the constituency, with major investments in road connectivity, agriculture and infrastructure aimed at transforming the area into a new economic growth centre.
Among the biggest undertakings is a road infrastructure programme worth approximately RM2.7 billion involving three major projects comprising 10 construction packages.
According to BERNAMA’s report on January 5, the projects comprise five packages under the Serian-Gedong-Samarahan Highway, two packages for the upgrading of Jalan Gedong-Simunjan, and three packages for the proposed Jalan Gedong-Semalatong.
The projects are expected to improve connectivity between Gedong and the surrounding areas, while opening up new opportunities for economic activities and improving access for residents.
Gedong is also being positioned as a new growth centre through the proposed Mini Isthmus development, which is expected to support commercial activities and improve access to facilities as part of the area’s longer-term development plans.
Agriculture is another key focus, particularly in Lubok Punggor, where the Sarawak Government has allocated approximately RM300 million for a modern irrigation system covering 500 hectares of paddy cultivation.
The project, announced by Abang Johari in December 2024, is expected to strengthen local rice production and support the state’s food security agenda, with implementation targeted for completion in 2027.
Meanwhile, the Sarawak Government has also approved RM15 million to rebuild the Gedong Waterfront embankment following serious riverbank erosion that affected several homes and infrastructure.
The allocation is intended to reconstruct the embankment, while affected families have been relocated to safer areas.
These developments reflect the state government’s push to improve infrastructure and expand economic opportunities in Gedong, particularly through better road connectivity and modern agricultural facilities.
Housing is also part of Gedong’s development agenda, with the Gedong Village Expansion Scheme (SPK) providing 50 affordable homes through a RM22.6-million project by the Land Custody and Development Authority (LCDA).
The scheme features solar-equipped homes, with 25 units fitted with solar panels, while buyers of the remaining units can opt for the installation.
The houses are also built using modern Industrialised Building System (IBS) technology.
Separately, plans are in place for approximately 100 additional housing units to accommodate population growth and support Gedong’s expansion as a developing economic centre.
Five years on, the question remains whether Abang Johari’s political standing in the constituency will go unchallenged or whether an opposition candidate will step forward when nominations open tomorrow.
Nomination day is scheduled for tomorrow (Nov. 28), followed by early voting on December 8 and polling on December 12.





